1. Basic information
2. Ingredients and formula
3. Instructions for use
4. Safety warnings
5. Production and shelf life information
6. Company information
7. Legal and certification information
The production cost of electrolytic tinplate is affected by many factors, including raw materials, energy, labor, equipment and environmental protection costs.
Improving the production efficiency of tinplate printing requires starting from many aspects such as equipment upgrading, process optimization, personnel training and technological innovation.
Solutions to avoid printing distortion
1. Material selection and testing:
2. Equipment maintenance and upgrade:
3. Process parameter optimization:
4. Operation training and management:
The production process of tinplate printing is divided into:
1. Design and plate making
2. Material preparation
3. Pre-printing treatment
4. Printing
5. Drying and curing
6. Post-processing and packaging
In summary, the production cycle of tinplate printing is usually between 9-20 days.